1. Prepare the modules for mounting.
1. Disconnect modules that are connected into gangs.
2. Disconnect the power cord, network cable, tubing and inlet filter assemblies.
3. Remove the end plate.
2. Detach the back panel from the modules.
1. Hold the module with the back panel facing toward you.
2. Find the panel latch at the top left side of the module, near the panel hinge
3. Press down firmly on the panel latch, and then continue to press down while
you slide the panel to the right until the hinge pins are detached.
3. Mark the position of the anchor points, and drill holes for the first panel.
1. Hold the panel against the wall in the desired position.
2. Use a pencil or non-permanent marker to mark the center of the 4 anchor points, and then set the back panel aside.
4. Drill through the center of each anchor point mark.
5. Secure the first panel to the wall with the metal brace facing out. Use appropriate hardware for each of the 4 anchor points. Do not overtighten.
6. Clip the second panel to the first panel, and then secure it to the wall. Use appropriate hardware for each of the 4 anchor points. Do not overtighten. Repeat as necessary to mount up to 5 connected panels.
7. Attach a module to the first panel.
1. Align the hinges on the module with the hinge pins on the mounted panel. Align the hooks on the mounted panel with the hook receptacles on the module
2. When the module lies flat against the mounted panel, firmly push to the left to lock onto the panel. If this is difficult, loosen the mounting hardware slightly and try again.
8. Attach a module to the second panel and connect it to the first module.
1. Unlock and raise the latch arm on the first module.
2. Align the hinges on the next module with the hinge pins on the next mounted panel. Align the hooks on the next mounted panel with the hook receptacles on the next module. Align the connections on the modules.
3. When the next module lies flat against the next mounted panel, firmly push to the left to lock it onto the panel and ensure a full connection with the first module.
4. Lower and lock the latch arm. Repeat as necessary to attach and connect up to 5 modules.
9. Prepare connected modules for use.
1. Verify that connected modules are firmly attached and latch arms are lowered and locked.
2. Attach the end plate to the last module in the gang. Verify that the latch arm is lowered and locked.
3. Connect the inlet filters, tubing, network connection and power cord
4. Verify that each module in the gang is activated and a consecutive bay number is displayed on the LCD. See LCD Screen on page 11.